Home News Lagos Announces Traffic Diversion at Agege for Construction of Collector Drain

Lagos Announces Traffic Diversion at Agege for Construction of Collector Drain

by Sammy
Traffic Diversion

As part of efforts to address the flooding problem at Funmilayo Bus Stop and upstream of Kushoro/Igbayilola Streets in Agege Local Government Area, the Lagos State Government will divert traffic from Iyana Ipaja Road to facilitate the redirection of stormwater and the construction of cross culvert from Saturday, September 23rd, to November 30th, 2023.

The alternative routes available for Motorists during the construction period are as follows:

I) Traffic from Iyana Ipaja heading towards the Oke Koto axis will be diverted after the Mulero Street intersection to the outward lane for counterflow and will return to the original lane at the next median opening.

II) Traffic from Agbotikuyo/Oke Koto axis heading towards Iyana Ipaja will be required to merge into one lane to accommodate counter flow and will revert to two lanes after passing the Ibile Oil and Gas Petrol Filling Station at the Arige Street intersection.

ADVISORY

Motorists are urged to exercise patience as the diversion and lane merging are part of the traffic management plans aimed at eliminating flooding.

Mr. Oluwaseun Osiyemi

Honourable Commissioner for Transportation.

Related Articles

Leave a Comment