Ajaokuta-Kaduna-Kano | InsideOjodu https://www.insideojodu.com ...conecting the community Fri, 07 Aug 2020 14:20:17 +0000 en-US hourly 1 https://wordpress.org/?v=5.9.10 http://www.insideojodu.com/wp-content/uploads/2018/12/favicon.ico Ajaokuta-Kaduna-Kano | InsideOjodu https://www.insideojodu.com 32 32 COVID-19: Ajaokuta medical centre shut down after confirming index case https://www.insideojodu.com/covid-19-ajaokuta-medical-centre-shut-down-after-confirming-index-case/ https://www.insideojodu.com/covid-19-ajaokuta-medical-centre-shut-down-after-confirming-index-case/#respond Fri, 07 Aug 2020 14:20:17 +0000 https://www.insideojodu.com/?p=15425 The Management of Ajaokuta Steel Company has shut down the Ajaokuta Hospital for decontamination…

The post COVID-19: Ajaokuta medical centre shut down after confirming index case first appeared on InsideOjodu.]]>
The Management of Ajaokuta Steel Company has shut down the Ajaokuta Hospital for decontamination after reporting its index case of COVID-19.

This was contained in a statement issued and posted on the hospital’s notice board on Friday and signed by the hospital’s Deputy General Manager, D.Y. Salisu.

“You may be aware that a case of Covid-19 had been confirmed at the Ajaokuta Steel Company Limited Medical Centre. The victim had since been moved to the Kogi State Specialist Hospital, Lokoja under the watch of relevant agencies.

“The hospital will be shut down for services effective 12 noon, Friday 7th August 2020.

“In line with Nigeria Centre for Disease Control protocol and guidelines, all contacts have been directed to proceed on self-isolation for 14 days and the entire hospital will be decontaminated to prevent further infection and community spread,” the statement read,

The post COVID-19: Ajaokuta medical centre shut down after confirming index case first appeared on InsideOjodu.]]>
https://www.insideojodu.com/covid-19-ajaokuta-medical-centre-shut-down-after-confirming-index-case/feed/ 0
Presidential Flag-off of the Ajaokuta-Kaduna-Kano construction holds today https://www.insideojodu.com/presidential-flag-off-of-the-ajaokuta-kaduna-kano-construction-holds-today/ https://www.insideojodu.com/presidential-flag-off-of-the-ajaokuta-kaduna-kano-construction-holds-today/#respond Tue, 30 Jun 2020 09:02:42 +0000 https://www.insideojodu.com/?p=14227 The Presidential Flag-off of the Construction Phase of the Ajaokuta-Kaduna-Kano (AKK) Gas Pipeline Project…

The post Presidential Flag-off of the Ajaokuta-Kaduna-Kano construction holds today first appeared on InsideOjodu.]]>
The Presidential Flag-off of the Construction Phase of the Ajaokuta-Kaduna-Kano (AKK) Gas Pipeline Project holds today, June 30, 2020.

InsideOjodu reports that the flag off will be performed virtually by President Muhammadu Buhari from the Presidential Villa in Abuja

According to the Nigerian National Petroleum Corporation (NNPC) management who disclosed this via its Twitter handle @NNPCgroup on Tuesday Morning, it said flag off begins by 11am at two different locations; Ajaokuta (Kogi St) & Rigachikun (Kaduna St).

The Ajaokuta Kaduna-Kano gas pipeline project is a session of the Trans-Nigeria gas pipeline with a capacity to transport about 2.2Bcf/d of gas per day.

It will boost the domestic gas consumption, industrialization and power generation.

See Tweet below:

 

The post Presidential Flag-off of the Ajaokuta-Kaduna-Kano construction holds today first appeared on InsideOjodu.]]>
https://www.insideojodu.com/presidential-flag-off-of-the-ajaokuta-kaduna-kano-construction-holds-today/feed/ 0